Repairs progress on historic Chelmsford footbridge

Repairs progress on historic Chelmsford footbridge

A significant restoration project aimed at preserving the historic Seymour Street Bridge in Chelmsford has progressed to a crucial stage. The bridge, which connects Central Park with Seymour Street, is currently undergoing repairs following its deterioration.

Repairs underway for Grade II listed bridge

Earlier this year, Chelmsford City Council initiated restoration works on the Grade II listed structure to ensure its safe use for years to come. As a precautionary measure, the bridge is closed to pedestrians during the ongoing works.

Since the restoration began in May, it was discovered that the bridge required more extensive repairs than initially expected. Engineers and surveyors conducted a thorough assessment to evaluate the condition of the bridge, particularly its underside, which revealed that the supporting curved beams were in worse shape than anticipated. This prompted the need for further specialist investigation before proceeding with the restoration.

Assessment findings confirm repair feasibility

The council has now received the assessment report, which indicates that the bridge can be repaired without major strengthening efforts, avoiding potential delays that could arise from additional load testing or the need for temporary support structures. With the specific repair requirements now identified, the restoration work is set to continue and is hoped to be completed by the end of the year, contingent on weather conditions and river water levels.

Initial repair efforts included work on the bridge’s distinctive parapets. However, the unexpected issues with the supporting structure necessitated a more detailed survey to ensure the integrity of the restoration process.

Historical significance and future plans

Seymour Street Bridge, constructed in 1954 from reinforced concrete, replaced an earlier timber bridge that had fallen into disrepair. It is an important part of Chelmsford’s heritage; a bridge at the spot first appears on the 1895 Ordnance Survey map. The bridge is noted for its architectural and historical significance and has suffered from deterioration due to water-related corrosion and cracking in the concrete.

Councillor Rose Moore, Cabinet Member for a Greener Chelmsford, acknowledged the frustrations related to the bridge’s closure and expressed gratitude for the community’s patience during the assessment period. She confirmed that the final phase of repairs can now commence, emphasising the council’s commitment to returning the bridge to public use as swiftly as possible while ensuring safety and sustainability.

As work progresses, another crossing is available nearby for pedestrians, located just a minute’s walk from the bridge behind Virgin Active and Essex County Cricket Club.

Source: Chelmsford City Council